Taskforce Logo
General1,561 views0% helpful (0 votes)

Duo Valve Requirements - Mains Pressure Storage

An approved isolation valve and non return valve must be installed in the supply line to the water heater.

Jason Bright

Updated 19 July 2026
An approved isolation valve and non return valve must be installed in the supply line to the water heater.
A pressure limiting valve (PLV) and expansion control valve may also be required.